top of page
Vassar - Main Building Interiors

Richard Turlington Architects Inc prepared the design development and construction documents for the main lobby renovation at the College.  This was a fast-tracked project and the renovation was done over the summer break.  The renovation of Vassar’s first building, circa 1861, to upgrade the original basement to a new main lobby and orientation center was completed in 15 weeks.  The project consisted of reconnecting the main admissions building to the student union, reshaping the existing low ceiling with new groin vaults, integrating all spaces leading to the main lobby, and enlarging the opening of the main stair leading from the dormitories above. 

© 2023 Richard Turlington Architects, Inc. All Rights Reserved.

This site uses cookies for certain functions. By using this site, you consent to the use of cookies. PRIVACY POLICY

55 Church Street, Suite 201

New Haven CT, 06510

Tel: 203-772-2459

Email: Info@RT-Arch.com

  • YouTube Social  Icon
  • Twitter Social Icon
  • Facebook Social Icon
  • LinkedIn Social Icon
  • Instagram Social Icon
bottom of page